This is not an LMS replacement diagnostic

Keep your current LMS,
and find the one area that is losing ground

Ten questions check engagement, completion, content, operations, mobile, and security, and pinpoint where to add a 28-day parallel pilot.

ISMS-P ISO 27001 The first pilot is an independent validation with no integration into your existing LMS.
See features and cases first

Diagnoses LMS operations areas including engagement, completion, content, operations, mobile, and security.

The diagnostic tool requires JavaScript. See the diagnostic items and the 28-day pilot below.

See diagnostic items and pilot

From diagnosis to a 28-day pilot, step by step

No replacement decision — just confirm the one area losing ground, within 28 days.

  1. 1

    Diagnose the loss area with 10 questions

    Score 9 areas — engagement, completion, content, operations, mobile, security — as 0/5/10 to find the single weakest one.

  2. 2

    One area, a 28-day parallel pilot

    Keep your existing LMS in place and validate a narrow scope: 50–100 learners, one training task, one KPI.

  3. 3

    Decide next from before and after

    Decide whether to expand or stop based on the agreed KPI. No results, no expansion.

Audience50–100 people
Duration28 days (4 weeks)
TaskSingle weakest area
KPI1 (plus 1 optional)
  1. BeforeAgree on audience, comparison group, and KPIPilot definition
  2. Week 1Send first content and tasks, drive engagementEngagement report
  3. Week 2Measure questions, completion, and access dataInterim report
  4. Week 3Nudges, content additions, admin feedbackImprovement report
  5. Week 4Collect results, write before/afterOne page for executives

Success if the agreed KPI is met, discuss expansion · Miss we provide only a cause report and hold any expansion.

IT and security, answered upfront

We answer the questions that hold up starting a pilot.

  • Not for the first pilot. Your current LMS stays exactly as it is.

  • Only minimal fields such as name, email, and department, and anonymous or pseudonymous operation can be reviewed.

  • We can provide ISMS-P and ISO 27001 evidence.

  • The first pilot is an independent validation with no integration into your existing LMS.

Keep your current LMS in place,
and validate just one area with a 28-day parallel pilot.

Talk about a pilot